Most disagreements over payment terms are not really about money. They are about which side carries the risk at each stage of an order, and whether the payment schedule admits that honestly. A buyer who accepts whatever schedule arrives, and starts negotiating only after a problem appears, has already given away the strongest tool available. Terms should be designed together with the price, and for the same reason: the schedule decides what each side can still do when something goes wrong.

Finished, folded and ready to move - exactly the stage where the balance usually falls due. Whether that payment buys proven goods or merely packed ones depends entirely on how the schedule was written.
Before money moves, the buyer carries almost nothing, while the supplier carries the cost of materials, labour and the calendar. Every payment exists to move part of that risk across the table, and the shape of the movement matters more than the total. Ask what each instalment is buying: materials on order, capacity reserved, goods produced, goods proven, goods released. Where two of those are bundled into one large early payment, one of them is being paid for before it exists.
A payment that falls due before the work it pays for is finished leaves the buyer holding a promise. Attach each transfer to an event that can be verified: the fabric booked, with a document to show it; the goods cut; the goods produced; the goods inspected and passed; the shipment released. The supplier should be able to name the event, and the buyer should be able to confirm it without asking for a favour. Where an instalment sits, the leverage sits.
The most common weak point is the final payment, because it is the largest and the last. If it falls due on a production date or a loading date, the buyer pays for whatever was made, whether or not it matches the approved sample. Tie the release of the balance to an inspection result the buyer has accepted, or to shipping documents checked line by line. A supplier who objects to that link has told you something useful about their own confidence in the goods.
Late in an order, goods, documents and funds are all in motion at once, and whoever moves first gives up protection. Name the sequence in the order itself: inspection accepted, then draft documents checked, then payment released, then original documents handed over. Leave the order unstated and a buyer can end up paying against a copy, or chasing originals after the goods have sailed. This is not paperwork ritual; it is the last moment a buyer still holds something the other side wants.
Before signing a payment schedule, walk through it once:
Payment terms are a risk allocation, not an administrative detail. Attach money to events you can verify, keep the balance behind the inspection, fix the order in which documents and funds move, and put the whole schedule into the written order. The buyer who designs the schedule keeps the leverage. The buyer who inherits one is financing someone else's risk.

From the outside, one finished garment proves nothing about the rest of the carton. That is why the last payment should sit behind an inspection the buyer accepted, not behind a loading date.